NUR GLOBALGet in touch
Aerial view of the industrial site

NUR GLOBAL · KYRGYZSTAN

Better materials.
New possibilities.

A focus on aerated concrete blocks. Developing practical, lightweight walling materials in Kyrgyzstan.

01 / MATERIALS THAT BUILD WHAT’S NEXTCHUY REGION · KYRGYZSTAN
Autoclaved aerated concreteAAC BLOCKS中文 / Русский / English

Lighter walls.
A considered choice.

Autoclaved aerated concrete (AAC) is a lightweight, porous walling material used for internal walls, external walls and partitions where specified by the project design. Selection should consider wall use, density, strength and thermal requirements.

Lightweight structure

Its porous structure gives AAC a low self-weight for consideration in wall design.

Thermal insulation

Air pores help reduce heat transfer. Wall performance should be assessed as part of the complete construction.

Project-led selection

Confirm thickness, density and strength against the drawings and the requirements of your project.

Thickness reference

MILLIMETRES / mm
01120mm
02200mm
03250mm
04300mm
About AAC material properties · EAACA

Rooted locally.
Built step by step.

Construction stage

Our building materials project is located at Ivanovka Station in Kyrgyzstan’s Chuy Region. The site is being developed through factory renovation and supporting infrastructure works.

These photographs show the site and factory buildings during construction. Please contact us to confirm commissioning and supply schedules.

Based in Kyrgyzstan. Focused on building materials.

NUR GLOBAL

NUR GLOBAL focuses on aerated concrete blocks and the development of a local building materials project. We work through requirements with project buyers, dealers and construction teams, from wall material selection to procurement discussions.

Our focus
Aerated concrete blocks
Project location
Chuy Region · Ivanovka
Website languages
中文 · Русский · English

Your next project
starts with a conversation.

Tell us what you are building. Let’s discuss specifications, quantities and delivery requirements.

For a quotation, please prepare

  1. Wall application and required dimensions
  2. Estimated quantity (m³)
  3. Delivery location and preferred timing

Project location

Kyrgyzstan · Chuy Region Ysyk-Ata District · Ivanovka Station

Specifications, pricing and supply arrangements are subject to agreement. Please call ahead before visiting the site.